Princeton ISD – Early Childhood & Jaguar Daycare

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Princeton ISD will be constructing an Early Childhood & Daycare center. Work associated with this project but is not limited to: dirt work, utility work, concrete paving, concrete walks, drilled piers, concrete slabs, structural steel, steel joints, metal deck, single ply roofing, steel studs, drywall, masonry, stucco, aluminum, steel and plastic laminate covered doors, aluminum windows, electrical, plumbing, HVAC, steel studs and drywall, resilient flooring, carpet tiles, quarry tile, wood gym floor, paint, acoustical ceiling, millwork, casework, expansion joint covers, marker board, tack boards, projection screens, fire extinguishers and cabinets, rolling shelves, toilet partitions, toilet accessories, metal lockers, plaque, identifying devices, and window blinds.

READ MORE

Aubrey ISD – Additions and Renovation Early Bid Package

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: The Aubrey High School Additions and Renovations project consists of five (5) additions to the existing Aubrey High School.  The overall square footage of additions is approximately 150,000 SF along with interior renovations adjacent to the additions, as well as other areas.  Currently, we are seeking proposals for furnishing of mechanical equipment and electrical switch gear only.  Bid packs for these scopes are forthcoming.

READ MORE

City of Plano – Fire Station #5 Early Package

Bid Time: 2:00 PM

Bids delivered to bid@pogueconstruction.com

Narrative: City of Plano Station #5 is a renovation and addition to the existing Fire Station on West Park Blvd. Building is 13,700+/- square feet. We will be renovating the inside of the existing station for new dorms, restrooms, offices and laundry areas as well as modifications to the existing Apparatus Bays. The addition will include a new kitchen, dayroom, fitness room, main entry, 2 addition Apparatus Bays and support areas. Project is currently scheduled to start construction in December 2023 and be completed December 2024.

Please note that we are only seeking proposals at this time for the Commercial Range (Bid Package 11D), HAVC RTU’s (Bid Package 23 B) and Electrical Generator, ATS, Switch Gear (Bid Package 26B).

READ MORE

Sanger ISD – New Sanger High School & Field House

Bid Time: 2:00 PM

Bids delivered to bid@pogueconstruction.com

Narrative: The work comprises the construction of A New High School & Field House for Sanger Independent School District, Sanger, Texas, as shown on the drawings and described in the specifications.

READ MORE

Aubrey ISD – Elementary #4 Food Service & Electrical

Bid Deadline: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for Aubrey ISD New Elementary School #4. The Project is composed of ​​a new elementary campus​​ and related site​​ work located in ​​Aubrey, Texas​​.

This bid day is strictly for the following bid package scopes:

  • 11D – Food Service
  • 26B – Electrical

All other scopes of work not noted above will bid at a date to be determined in mid-July once more complete documents are available. Sorry about any inconvenience. We appreciate your partnership and look forward to your participation on this project

READ MORE

Aubrey ISD – New Elementary School #4

Bid Time: 2:00PM

Deliver Bids To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for Aubrey ISD New Elementary School #4. The Project is composed of ​​a new elementary campus​​ and related site​​ work located in ​​Aubrey, Texas​​. The “Work” is defined in the Contract Documents to include, but not necessarily to be limited to new elementary campus, including all mechanical, electrical, plumbing, and general construction work.

Note: The following trades were bid with Early Packages: RTUs, Electrical Switchgear, Site Concrete, Earthwork, SWPPP, Site Requirements, Pavement Markings, Fences/Gates, and Site Utilities.

***** Bidding Update *****

Notice to All Bidders:

 There has been a schedule revision for bidding of the Aubrey ES #4 project.  The June 6, 2023 bid date will consist of only the following scopes of work: building concrete, precast concrete, structural steel, playground, elevators, fire sprinkler, plumbing, mechanical and fire alarm.

 Pogue is expecting more complete documents for the Foodservice Equipment and Electrical scopes of work on Wednesday (6/7).  Those two trades will then subsequently bid on Tuesday (6/13).

 All other scopes of work not noted above will bid at a date to be determined in mid-July once more complete documents are available.  Sorry about any inconvenience.  We appreciate your partnership and look forward to your participation on this project.

READ MORE

Community ISD – Middle School #2 – Offsite

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for this project. The scope of work for this project includes the following Offsite Work bid packages for Community ISD – Middle School #2 Offsite – GMP:

  • 03A – Concrete
  • 07A – Waterproofing/Air Barriers/Caulking (Pavement sealants)
  • 26A – Electrical
  • 31A – Earthwork
  • 31C – SWPPP
  • 32A – Asphalt Paving
  • 32C – Pavement Markings/Specialties
  • 32I – Planting, Irrigation, Turfs & Grasses
  • 33A – Site Utilities
READ MORE

Prosper ISD – Elementary School #18 – Civil and Landscape Package (RFP 001)

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected GC for this project. The work consists of Site Work related to New Elementary School #18.

****Please note the original Plans, Specs and Addenda (1-3) are posted for reference for bidding RFP 001 (Civil and Landscape Package). ****

Please provide breakout pricing for the Offsite Work as indicated on the C2 and C3 series drawings.

Bidding the Site Work includes the following Bid Packages:

  • 03B Site Concrete
  • 04A Masonry
  • 05A Metals
  • 07B Site Sealants
  • 07C Sheet Metal
  • 09K Painting
  • 10C Signage
  • 31A Earthwork
  • 31C SWPPP
  • 31E Site Requirements
  • 32A Traffic Signals
  • 32C Pavement Markings
  • 32G Fences/Gates
  • 32I Planting and Irrigation
  • 33A Site Utilities
READ MORE

Aubrey ISD – Elementary School #4 – Early Package #2 (Site Work)

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for this project. The scope of work for this project includes the following Site Work bid packages for Aubrey ISD Elementary School #4:

  • 03A – Concrete (Site)
  • 31A – Earthwork
  • 31C – SWPPP
  • 31E – Site Requirements
  • 32C – Pavement Markings/Specialties
  • 32G – Fences & Gates
  • 33A – Site Utilities
READ MORE