Competitive Sealed Proposal/Hard Bid

City of McKinney – East Louisiana Parking Lot

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: The East Louisiana Parking Lot is a new parking lot facility to be located on a site at 400 E. Louisiana Street. The parking lot will contain approximately 205 spaces on two lots and site amenities on approximately 2.95 acres. See Section 7 for an overview of the ELPL site. The East Louisiana Parking Lot project will have drive lanes; parking spaces, including accessible spaces; sidewalks and ramps; landscaping and irrigation; electrical and light standards; and various utilities. Site work will include the required on-site extension of required utilities. See Section 1.4 for a detailed list of potential amenities. Design is currently complete for the ELPL and construction will occur in a single phase.

READ MORE

Eagle Mountain-Saginaw ISD – Eagle Mountain High School #4

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: The work comprises the construction of Eagle Mountain High School for Eagle Mountain-Saginaw Independent School District, Fort Worth, Texas, as shown on the drawings and described in the specifications. The project is a new ground-up high school including stadium. The work will be done under one lump sum contract.

READ MORE

City of Lewisville Fred Herring Recreation Center Renovation

**Thank you for your interest in bidding with Pogue Construction. Unfortunately, Pogue will no longer be bidding for this project. If you have any questions, do not hesitate to reach out to our team. Please see our website for other upcoming projects.**

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: The Project consists of the renovation of a portion, (+/-11,683 sf), of a +/-29,857 GSF facility for the Parks and Recreation Department for the City of Lewisville, Texas. The remaining square footage will have limited work including a new Fire Suppression System. The Project will include the interior and exterior demolition of the existing facility and associated utilities, a new emergency generator, new decorative metal fencing, drilled concrete piers, concrete slab on grade with grade beams, concrete paving on prepared sub-base, steel frame, brick veneer, spray foam insulation, batt insulation, rigid insulation, TPO membrane roofing, prefinished metal roofing, downspouts, aluminum storefront and glazing, decorative metal fencing and gates, phenolic toilet partitions, aluminum door frames, prefinished wood doors, acoustical ceiling system, 2×2 lay-in lighting, LED lights, electrical systems, ceramic tile, tile carpeting, LVT, plastic laminate covered millwork, solid surface counter tops, new plumbing fixtures, new HVAC ducting, new toilet accessories, etc.

READ MORE

Eagle Mountain-Saginaw ISD New Lake Country Elementary School

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Designer: Huckabee

Estimated Start Date: July 1, 2020

Estimated End Date: July 9, 2021

The Eagle Mountain-Saginaw New Lake Country School project consists of the construction of a new 77,200 s.f. Elementary School in Fort Worth. Project Scope includes Site Work, Landscaping, Civil, Structural and Technology for the construction of a new ground-up Elementary School. This project is a CSP bid and proposals are due back to Pogue no later than 2:00PM on May 5, 2020. RFIs are due by April 24 at end of day to allow for processing.

Pre-proposal conference info: A pre-proposal conference is scheduled for Thursday, April 16, 2020, at 10:00am local time, with representatives of the Owner, Architect, and Engineer available to address proposal document issues with potential proposers. The pre-proposal conference will occur virtually via Go To Meeting at the address listed here: https://global.gotomeeting.com/join/337690669. You may also call in to this number: +1(872)240-3412

READ MORE

Crossroads Christian Church Youth Building Addition

Bid Day: September 19, 2019

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

General Construction of a new youth building with a 45,187 s.f. footprint, with exterior
composition of brick, EIFS, tilt-up concrete, metal wall panels, aluminum storefront, and standing seam and TPO roofing, and providing an auditorium, worship/gymnasium spaces, offices, classrooms, and auxiliary support spaces, located in Grand Prairie, Texas.

Architect: HH Architects

 

Pre-Bid Meeting: September 4, 2019 at 1:00PM onsite.

**Please make a note that all Addendum 1 documents are included in the released bid set of documents.**

READ MORE

Melissa High School Phase 02

Contract will be a single general construction contract for construction of Phase 02 construction at Melissa High School approximately 65,000 gross square feet.The work includes expansion of the existing Fine Arts building to provide spaces for Choir, Percussion, Theatre, Scene Shop and associated support spaces such as offices and storage. Two art rooms will be added and will share a paint booth and storage room. A large part of the Fine Arts Building scope will include the addition of a 1,000 seat Auditorium with full fly loft, lobby, control rooms and back of house support spaces such as dressing rooms and storage spaces. The existing Student Union Building will be expanded to provide additional seating for 150 students. The seating expansion will result in the relocation of an existing chair storage and renovation of an existing coffee bar. The existing Athletics building will add a second practice gym to its footprint with telescoping seating, gym storage, and public restrooms. Boys basketball locker rooms, showers, and Coach’s office will be added. Phase 02 will also include associated site improvements for these additions as well as student and staff parking as required.

Bid Date: September 5, 2019

Bid Time: 2:00PM

Bid Delivered to: bid@pogueconstruction.com

 

READ MORE
1 2 3