Arlington ISD Gunn Fine Arts & Dual Language Academy

Pogue Construction is the selected General Contractor on the Arlington ISD – Gunn Fine Arts and Dual Language Academy. The first phase of the project was the civil site package and has already been bid. The second phase of the project is the building portion which includes and is not limited to, Demolition, Drywall, Structural Steel, and Electrical and Mechanical trades. The building project is set to begin in April of 2020 and run through September of 2022.

Bid Day: February 19, 2020

Bid Time: 2:00 PM (CST)

Bids Delivered to: bid@pogueconstruction.com

Important Note: This project will be constructed at an active campus. Reference the phasing plan for full details of project phasing requirements.

 

*IMPORTANT NOTE* A SPECIAL GUNN FINE ARTS & DUAL LANGUAGE ACADEMY PRE-BID MEETING WILL BE HELD TO DISCUSS CONSTRUCTABILITY, PHASING, AND TEMPORARY SHORING. WE ARE ASKING ALL DEMOLITION, SCAFFOLDING, CONCRETE, MASONRY, AND STEEL CONTRACTORS TO ATTEND.

Date: Thursday, February 6, 2020

Time: 3:15pm

Location: Pogue Job Trailer @ Gunn Jr. High School: 3000 S Fielder Rd, Arlington, TX 76015

Following this meeting, we will have a general preconstruction meeting at 4:00 where we will walk the site and review existing conditions.

A second Prebid meeting will be held at the same location on Tuesday, February 11, 2020 @ 4:00pm to accommodate any subcontractors that cannot attend the 2/6 meeting.

READ MORE

Lewisville ISD Garden Ridge ES Restroom Renovation & Flooring Replacement at 4 Campuses

Designer: Huckabee

Pogue Construction is the selected General Contractor for these projects. The Garden Ridge ES Restroom Renovation is the renovation of campus restrooms and replacement of plumbing fixtures. The Flooring Replacement at 4 Campuses project includes replacement of flooring material at Castle Hills Elementary in Lewisville, Hebron Valley Elementary in Carrollton, Indian Creek Elementary in Carrollton, and Liberty Elementary in Flowermound.

 

READ MORE

Lewisville ISD Forest Vista 20 Yr Refresh

Designer: Huckabee

Pogue Construction is the selected General Contractor for this project. This project includes renovation and replacement of existing building components including mechanical, electrical, and plumbing systems, paint, roofing, flooring, wall finishes, A/V equipment, technology and security equipment, casework, door and hardware, furniture, and other items.

READ MORE

Lewisville ISD Hebron High School 20 Year Refresh

Pogue Construction is the selected General Contractor for this project. Multi-phased renovation of an occupied campus including renovation/replacement of plumbing, mechanical and electrical systems, elevator upgrades, roofing, interior finishes, A/V, technology, security, millwork, doors/frames/hardware, lab casework/equipment and music equipment.

Bid Day: January 23, 2020

Bid Time: 2:00 PM (CST)

Bids Delivered to: bid@pogueconstruction.com

Important Note: Pre-Bid Meeting will be held Monday, January 20, 2020 at 9:00AM at Hebron High School (please meet at the Pogue Construction trailer located on the south side of the high school and north of the baseball field).

READ MORE

Lewisville ISD Chester Boyd Ag Center Addition

Pogue Construction is the awarded Construction Manager for this project. New 1,600+ SF pre-engineered metal building addition and 5,000+/- SF pre-engineered metal building open air structure including select demo, concrete foundations, flatwork, sidewalks, masonry walls, pipe bollards, downspout boots, sealants, doors/frames/hardware, sealed concrete, painting, room signage, specialties, plumbing, HVAC, electrical, sitework, termite treatment, pavement markings, fencing, site utilities.

 

Bid Day: January 23, 2020

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

 

Important Note: Pre Bid Meeting will be held Monday, January 20, 2020 at 11:00AM at the Lewisville ISD Boyd Agricultural Center (160 Fish Hatchery Rd, Lewisville, TX 75056).

READ MORE

City of Plano High Point North Maintenance Facility

Bids Delivered to: bid@pogueconstruction.com

Bid Time: 2:00PM

Architect: Huitt-Zollars

Pogue Construction is the selected General Contractor on this project. The High Point North Maintenance Facility project is a new, 22,000 SF facility for the City of Plano. The building will provide work shop space and offices for the Parks and Recreation department. Outside the building will be a fenced in area for storage of city vehicles and material storage.

**Please see Addendum #3 for the City of Plano Highpoint Maintenance Facility.  This addendum affects all trades as the latest drawings now include the City of Plano Standards for new construction.  Please review, update your previous proposal, and send back to Pogue WITH a complete bid form by 2:00 PM on July 2nd.  Thank you.**

 

READ MORE

Arlington ISD Gunn Fine Arts & Dual Language Academy – Civil Package

Pogue Construction is the selected General Contractor on the Arlington ISD – Gunn Fine Arts and Dual Language Academy. The first phase of the project includes Grading, Paving, Landscaping and Site Utilities. In addition, long lead items will be procured in this phase.

 

Important Note: This project will be constructed at an active campus. Reference the phasing plan for full details of project phasing requirements.

READ MORE

LISD Marcus High School Hail Damage Roof Repair

Pogue Construction is the selected General Contractor on this project. The Lewisville ISD Marcus High School Hail Damage Roof Repair 2019 Project is a replacement of the remaining damaged roofs at Marcus High School located in Flower Mound, Texas. The project consists of removal of the damaged flat roofs and standing seam metal roofs with replacement in kind. In addition, roof top Mechanical, Electrical, and Plumbing systems will need to be removed and reinstalled to accommodate the replacement roofing system. Replacement of curbs, condensate lines, gas lines, and other MEP systems may be required.

Bid Day: Oct 31, 2019

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

A Pre-Bid walk will be conducted on Tuesday, October 22nd at 1:30 PM at the school.

READ MORE

Community ISD – Community Middle School Renovations

Community ISD, Community Middle School – Renovation of existing gym, library, band hall, and exterior facilities.

Designer: WRA Architects, Inc.

Estimated Start Date: December 20, 2019

Estimated Completion Date: November 30, 2020

Bids Due: 2:00pm

Bids Delivered to: bid@pogueconstruction.com

*Important Note* A Pre-Bid Conference will be held at 3:45pm, November 5, 2019, at the Community ISD Administrative Offices, located at 611 FM 1138 North, Navada, Texas. Attendance is encouraged by anyone submitting a bid.

READ MORE

Wylie ISD Harrison Intermediate School

This project is a roughly 30,000 SF addition to the existing Wylie ISD Harrison Intermediate School Campus. The addition consists of a new cafeteria/kitchen area, as well as a six classroom storm shelter. There are miscellaneous renovations throughout.

Bid Day: February 27, 2020

Bid Time: 2:00 PM (CST)

Bids Delivered to: bid@pogueconstruction.com

READ MORE