Past Projects

Mesquite ISD – Elementary #34

Bid Time: 2:00PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Construction of a new elementary school (109,472 SF), including a storm shelter, and associated site work. Pogue Construction is the selected General Contractor for this project.

READ MORE

Traxxas Mechanical Upgrade

Bid Time: 2:00PM

Bids Delivered To: bid@pogueconstruction.com

Narrative:

Mechanical System:

This package would consist of adding six (6) new 25-Ton DX packaged rooftop cooling units for conditioning of the plan north warehouse. The plan south second floor storage space would be served by four (4) 25-Ton DX packaged RTUs and the first floor would be served by three (3) 25-TonRTUs. Duct will need to be routed through the second floor down to serve the first, and architectural shafts provided. High velocity jet-style air circulation fans shall also be provided throughout the space for the plan north warehouse and first floor of the plan south warehouse for improved air movement. Our proposal for the plan south warehouse space is designed around the use case. Because the second floor is typically unoccupied and used primarily as storage, this space would not require jet-style fans.

Electrical considerations for added HVAC:

A new 1000A panel shall be fed via three (3) sets of 4#400 AWG conductors from the main distribution board (MDB). This new panel shall be dedicated to service the newly added mechanical equipment. New board shall be located within the warehouse space near the main electrical room.

Standby Generator Backup:

After reviewing the provided utility bills for building electrical consumption, and accounting for the additional load added by the new mechanical equipment, it is our recommendation to provide a 800 kW standby natural gas generator with dual fuel options and sound enclosure. Please reference Site Plan PDF for two proposed locations.

READ MORE

Town of Prosper Central Fire Station and Administration

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

 

Pogue Construction is the Construction Manager for this project. This project consists of the construction of a new Central Fire Station and Fire Administration Building for the Town of Prosper, including Civil, Structural, Architectural, Fire Suppression, Plumbing, Mechanical, and Electrical Work.

READ MORE

Eagle Mountain-Saginaw ISD – Eagle Mountain High School #4

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: The work comprises the construction of Eagle Mountain High School for Eagle Mountain-Saginaw Independent School District, Fort Worth, Texas, as shown on the drawings and described in the specifications. The project is a new ground-up high school including stadium. The work will be done under one lump sum contract.

READ MORE

McKinney ISD Elementary School #22

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected general contractor for the project. This project consists of the construction of a new Elementary School for McKinney Independent School District, including Civil, Structural, Architectural, Fire Suppression, Plumbing, Mechanical, and Electrical work.

READ MORE

City of Lewisville Fred Herring Recreation Center Renovation

**Thank you for your interest in bidding with Pogue Construction. Unfortunately, Pogue will no longer be bidding for this project. If you have any questions, do not hesitate to reach out to our team. Please see our website for other upcoming projects.**

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: The Project consists of the renovation of a portion, (+/-11,683 sf), of a +/-29,857 GSF facility for the Parks and Recreation Department for the City of Lewisville, Texas. The remaining square footage will have limited work including a new Fire Suppression System. The Project will include the interior and exterior demolition of the existing facility and associated utilities, a new emergency generator, new decorative metal fencing, drilled concrete piers, concrete slab on grade with grade beams, concrete paving on prepared sub-base, steel frame, brick veneer, spray foam insulation, batt insulation, rigid insulation, TPO membrane roofing, prefinished metal roofing, downspouts, aluminum storefront and glazing, decorative metal fencing and gates, phenolic toilet partitions, aluminum door frames, prefinished wood doors, acoustical ceiling system, 2×2 lay-in lighting, LED lights, electrical systems, ceramic tile, tile carpeting, LVT, plastic laminate covered millwork, solid surface counter tops, new plumbing fixtures, new HVAC ducting, new toilet accessories, etc.

READ MORE

Mesquite ISD – Elementary School #34 Early Structural Steel, Millwork, Roofing Bid Package

Bid Time: 2:00PM

Bids Delivered To: bid@pogueconstruction.com

Architect: WRA Architects, Inc.

Pogue Construction is the selected General Contractor for the project.

Narrative: New construction of elementary school, including a storm shelter. This bid is for Structural Steel, Millwork, and Roofing, only.

 

Pre-Bid Virtual Meeting:

Day: October 8, 2021

Time: 1:00-1:30 PM

Team Meeting Link (copy and paste into browser): https://teams.microsoft.com/l/meetup-join/19%3ameeting_ODBkMTFjMDItNzFkZi00Y2JhLWIwNWUtZWExZDVhZDNjOGE2%40thread.v2/0?context=%7b%22Tid%22%3a%2207b07637-a76f-401a-9e20-25c6419b6bfb%22%2c%22Oid%22%3a%2284d9100c-18bb-4398-b829-ca50fc7bd282%22%7d

READ MORE

Wylie ISD – Burnett JHS Addition and Renovation & Cooper JHS Addition and Renovation

Bid Time: 2:00PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for the project.

Burnett:

An addition and renovations to the existing Junior High School.  The addition provides a new Ensemble room and associated site components.  The interior renovation includes structural modifications to the existing black box room to increase the volume, new finishes and a new pipe grid and theatrical lighting. Associated site and utility work will be required to accommodate the new addition.

Cooper:

An addition and renovations to the existing Junior High School. The addition includes a new Band Hall and vestibule.  The renovation includes Choir, Ensemble, practice rooms, associated offices, and storage. Associated site and utility work will be required to accommodate the new addition.

READ MORE

McKinney ISD – Elementary School #22 Structural Steel Bid Package

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Architect: Corgan

Narrative: Pogue Construction is the selected general contractor for this project. These documents are for the Structural Steel portion of the new Elementary School located in the Trinity Falls neighborhood in McKinney, TX.

READ MORE

Arlington ISD – Berry Elementary Replacement

Bid Time: 2:00PM

Bids Delivered To: bid@pogueconstruction.com

Architect: HKS

Pre-Bid Meeting: August 25, 2021 at 10:00AM

The Link to the Zoom meeting is: https://us02web.zoom.us/j/85275378846?pwd=WVljY1hyRmx4YVRXTDVwZWw5MnV0dz09 Attendance to the pre-proposal conference is not mandatory but highly encouraged.

Site Walk: August 25, 2021 at 2:00PM located 1800 Joyce Street, Arlington, TX 76010

Narrative: The Arlington Independent School District (AISD) will accept proposals for the 2019 Bond Program online, in accordance with state law, legal and local policies.  AISD uses an online bidding system (IonWave) that conforms with all laws. This will be a new elementary school to replace the existing Berry Elementary.

 

READ MORE
1 9 10 11 12 13 26