Past Projects

Gateway Church Houston Campus

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for Gateway Houston Renovations. Work consists of interior building finishes including new floorcovering, tile, paint, millwork, acoustical ceilings, wood doors and hardware, glass and glazing, and updated MEP.

This is an Integrated Project Delivery project. Several of our major scope trade partners have been working for over a year with the design team (Parkhill), Owner (Gateway) and Pogue Construction throughout the design process. The project has an unprecedented proactive teamwork mindset, that all contractors must adopt. We will utilize lean construction methods as well as pull planning throughout the duration of the project and expect all our trade partners to participate in these activities. Our goal is a well-organized, exceptionally managed project where coordination and teamwork are performed at a high level.

READ MORE

Wylie ISD Dodd Elementary School Renovations

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

  • Virtual pre-bid meeting: 7/28/21 @ 2PM via Teams: https://teams.microsoft.com/l/meetupjoin/19%3ameeting_YWZiYjkwNTQtZWY4ZC00M2ZjLWI5NTItZmU2N2FhYzBlZmE3%40thread.v2/0?context=%7b%22Tid%22%3a%22691ae9ef-5399-497f-80bb9d215be3a0e4%22%2c%22Oid%22%3a%22249190ff-b9de-4eba-bba5-aa14f4567713%22%7d
  • Deadline for pre-bid questions: 8/4/21 @5PM

Pogue Construction is the selected General Contractor for this project. Scope of work is classroom/storm shelter addition, canopy re-work, and office renovation at Dodd Elementary School.

READ MORE

CyFair ISD Transportation Center #6

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Pre Bid: 7/7/2021 @ 10AM – Cypress-Fairbanks Independent School District, Facilities & Construction Conference Room, 11430-B Perry Road, Houston, Texas 77064.  Representatives of the Architect and Owner will be present at this meeting

Substantial Completion date: December 1, 2022

New Administration building including service bays and alternate square footage to include an alternate, new covered bus barns, new covered fuel station, parking, landscaping and site utilities.

READ MORE

Pasadena ISD Administration Building

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: GPD Group

Generally, the Project consists of a new administration building for the School District that includes offices, a Board Room, and training rooms. In addition to the District’s administration, departments that will housed in the new facility include Human Resources, Tax, Police, Curriculum and Instruction, Student Services, Purchasing, Payroll, Accounting, Worker’s Compensation, and Grants. Sitework includes storm water detention, underground drainage, concrete paving, planting, and irrigation. The structural systems include a concrete slab on grade; suspended concrete floors; steel columns, beams, and joists; and tilt-up concrete panels. Finishes include painted, gypsum board partitions, carpeting, resilient flooring, and suspended acoustical board ceilings.

READ MORE

Cleveland ISD – Baseball and Softball Fields Renovations

Bid Time: 1:00PM

Bids Delivered to: bid@pogueconstruction.com

Pre-Bid Conference: June 24, 2021 @2:00PM – Cleveland ISD Service Center 326 FM 1010 Rd Cleveland, Texas 77327

Virtual Pre-Bid: https://teams.microsoft.com/l/meetup-join/19%3ameeting_OTY1ZTY5N2QtZGFmZS00ZjgwLWI2YjUtZmY4OWI2YjAzZTU5%40thread.v2/0?context=%7b%22Tid%22%3a%226724d89b-03d2-4528-9030-0eb337b1b2bb%22%2c%22Oid%22%3a%2270b2af40-0328-4eae-8897-31f803f12229%22%7d

The Owner plans to build a new Baseball / Softball Complex with Batting Cage Building, new Stadium Concession / Restroom Building, and renovation of the existing Baseball / Softball Complex. The Project may include the following general scope items: 1. Site utilities 2. Concrete paving 3. Foundation 4. Steel Structural frame 5. Metal fabrications 6. Face brick veneer & CMU 7. Metal & PVC Roofing 8. Interior walls 9. Synthetic Playing Fields 10. Steel doors and frames, aluminum frames 11. Specialties 12. Plumbing systems 13. HVAC Systems and building automation 14. Electrical and technology wiring

READ MORE

Lewisville ISD Distribution Center Renovations

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: Huckabee

This project consists of interior renovations and addition of two new restrooms to the LISD Distribution Center in Lewisville, TX.

Pre-Bid: June 17, 2021 @ 10:00AM via Teams (https://teams.microsoft.com/l/meetup-join/19%3ameeting_YjJiMjVkMjUtY2I2ZS00YmYxLWE1ZDctZjI3YjIwMGVlZTZj%40thread.v2/0?context=%7b%22Tid%22%3a%22691ae9ef-5399-497f-80bb-9d215be3a0e4%22%2c%22Oid%22%3a%220a3263ec-507b-4bae-8661-bff3dfd6598a%22%7d)

READ MORE

Lewisville ISD Lewisville High School Fine Arts Renovations

Bids Delivered to: bid@pogueconstruction.com

Bid Time: 2:00PM

Architect: Stantec

This project consists of the construction of a new orchestra hall for Lewisville High School in Lewisville, TX and interior renovations to the existing band, choir, and ensemble areas, as well as associate site work including but not limited to paving and new utilities.

Pre-Bid: June 17, 2021 @ 10:00AM via Teams (https://teams.microsoft.com/l/meetup-join/19%3ameeting_YjJiMjVkMjUtY2I2ZS00YmYxLWE1ZDctZjI3YjIwMGVlZTZj%40thread.v2/0?context=%7b%22Tid%22%3a%22691ae9ef-5399-497f-80bb-9d215be3a0e4%22%2c%22Oid%22%3a%220a3263ec-507b-4bae-8661-bff3dfd6598a%22%7d)

READ MORE

Lewisville ISD Eastside Aquatic Center Parking Renovations

Bid Time: 2:00pm

Bids Delivered to: bid@pogueconstruction.com

Architect/Engineer: McAdams

This project consists of the construction of a new parking lot and related site work including but not limited to paving, striping, landscaping, and utilities.

Pre-Bid: June 17, 2021 @ 10:00AM via Teams (https://teams.microsoft.com/l/meetup-join/19%3ameeting_YjJiMjVkMjUtY2I2ZS00YmYxLWE1ZDctZjI3YjIwMGVlZTZj%40thread.v2/0?context=%7b%22Tid%22%3a%22691ae9ef-5399-497f-80bb-9d215be3a0e4%22%2c%22Oid%22%3a%220a3263ec-507b-4bae-8661-bff3dfd6598a%22%7d)

READ MORE

Pasadena ISD George Thompson Intermediate School

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

The project consists of the construction of a new 160,267 square feet elementary school for 1200 students on a 26.1 acre tract to replace the existing George A. Thompson Intermediate School. Sitework includes grading, storm drainage, playfields, reinforced concrete parking and driveways, fencing, and landscaping and irrigation. The structural systems include drilled and underreamed piers, concrete grade beams, concrete slab on grade, and a steel frame. Exterior walls are masonry veneer and metal panels with masonry and steel stud backup. Interior partitions are of CMU and gypsum board on steel studs. Finishes include carpet, resilient flooring, ceramic tile, quartz flooring, natural stone, paint and suspended acoustical ceilings. Dry marker boards, tackboards, toilet partitions, aluminum walkway covers, acoustical panels, kitchen equipment, casework, and horizontal blinds are also a part of the Work. The project also includes new HVAC systems, electrical systems, fire sprinkler system, and plumbing systems

READ MORE

Godley ISD Elementary School #3

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: Huckabee

The “Project” of which the “Work” of this Contract is a part, is titled ​New Elementary School #3​ for ​Godley ISD​ and is composed of ​a new elementary school campus​ and related ​site​ work located in ​Cleburne, Texas​. The “Work” of this Contract is titled New Elementary School #3 and is defined in the Contract Documents to include, but not necessarily to be limited to: ​A new elementary school​, including all mechanical, electrical, plumbing, and general construction work.

READ MORE
1 10 11 12 13 14 26