Past Projects

Key School Package #2

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: HH

Pogue Construction is the selected General Contractor for Key School Package #2.  Package #2 consists of interior building finishes including new floorcovering, tile, paint, millwork, acoustical ceiling, wood doors and hardware, glass and glazing, and updated MEP.

READ MORE

Prestonwood Joe Perry Sports Complex

Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com

Architect: Parkhill
Anticipated Start Date: March, 2020
Anticipated Completion Date: TBD

This project consists of site development, concrete paving, synthetic sports fields, playgrounds, and
covered plaza/restroom on the existing Prestonwood Church Campus located at 6801 West Park Blvd,
Plano, TX 75093. Pogue Construction is competing in a selective bid list for this project.

READ MORE

Argyle ISD Elementary School #3

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Based on demographic projections, Argyle ISD’s maximum elementary school capacity will be exceeded in 2022-2023. The new Elementary School #3 will be located on District-owned property in the Canyon Falls master-planned community, northwest of the middle school at the corner of Denton Creek Blvd. and Prairie Ridge Rd.

Pre Bid Conference: February 3, 2021 @3:30PM at Argyle Intermediate School Cafeteria (800 Eagle Dr, Argyle, TX)

Scope of Work
• Architect: Corgan
• Location: Denton Creek Blvd. and Prairie Ridge Rd.
• Cost: $35,874,673

Tentative Project Schedule
Design: June 2020-December 2020
Procurement: November 2020-January 2021
Construction: January 2021-May 2022
School opens: August 2022
Grades served: Pre-K-5th Grade

READ MORE

Arlington ISD Webb Elementary School Replacement

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Estimate Start Date: April 13, 2021

Estimated End Date: May 31, 2023

Phasing Plan: Reference Volume 1 sheet AS0.0 for important Phasing Notes

Project Description: Webb Elementary School consists of a new two-story school building (102,907 SF) and associated site work including playground areas, basketball courts and parking lots/drives. This project is a replacement school and construction will be performed on an active site. Reference phasing plans for more information.

Pre Bid: 1/20/2021 @ 10AM.

The Link to the Zoom meeting is:

https://us02web.zoom.us/j/81450786371?pwd=NWRkbDlGKys4SGRSRjRQaW5nbXBhdz09

READ MORE

Cleveland ISD New Middle School & Elementary School

Bid Day: February 2, 2021

Bid Time: 1:00PM

Bids Delivered to: bid@pogueconstruction.com

 

The Owner plans to build a new two-story Middle School
(approximately 230,000 sf for approximately 1,600 students) and new two-story Elementary
School (approximately 130,000 sf for approximately 1,000 students). The Project may include
the following general scope items:
1. Site utilities,
2. Concrete paving
3. Foundation
4. Steel Structural frame
5. Metal fabrications
6. Face brick veneer & CMU
7. Aluminum, glass and window wall
8. Metal & TPO Roofing
9. Interior walls
10. Tile, resilient flooring, sheet carpeting
11. Suspended drywall, lay-in panels, sound absorbing units
12. Steel doors and frames, aluminum frames, plywood clad wood doors, Kynar
coated storefront
13. Casework
14. Specialties
15. Hydraulic elevator
16. Automatic sprinkler system
17. Plumbing systems
18. HVAC Systems and building automation
19. Electrical, technology wiring, lightning protection and emergency power
20. Fire detection, alarm and emergency call systems

Substantial Completion: May 1, 2022 for Elementary School & July 1, 2022 for Middle School

Estimated Cost: $75,000,000

Architect: Huckabee

Pre-Bid Meeting: Wednesday, 20 January 2021 @ 12:00 p.m. C.S.T.

In-person Location of Pre-Proposal Conference:
Cleveland ISD Service Center
326 FM 1010 Rd
Cleveland, Texas 77327

Virtual location of Pre-Proposal Conference:
1. Meeting video conference link:
a) https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjUxMTNhNDgtNjVjMC00ZjllLWIwMDMtYzkxNDNmY2FiNmE4%40thread.v2/0?context=%7b%22Tid%22%3a%226724d89b-03d2-4528-9030-0eb337b1b2bb%22%2c%22Oid%22%3a%2270b2af40-0328-4eae-8897-31f803f12229%22%7d

READ MORE

Community ISD ES #3 & HS Renovations

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Pre Bid: January 14, 2021 @1PM, at the Community ISD Administrative Offices (Old Middle School Cafeteria), located at 611 FM 1138 North, Nevada, Texas. Attendance is strongly encouraged by an administrative representative of the company or corporation submitting a bid as a General Contractor and Sub-contractor for the work.

High School Addition and Renovation and Middle School Renovations are bidding as one project. High School work consists of: 8 classroom additions, minimal associated site work, and minor renovations to the existing building. Middle School work consists of: bathroom renovations and door and door hardware replacements.

Elementary School #3 is a new ground up elementary school and associated site work.

READ MORE

LISD Southridge & Homestead 20 Year Refresh

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Homestead Location: 1830 E Branch Hollow Dr, Carrollton, TX 75007

Southridge Location: 495 W Corporate Dr, Lewisville, TX 75067

The Homestead & Southridge ES 20 Year Refresh project consists of renovation and replacement of existing building components including mechanical, electrical, and plumbing systems, paint, roofing, flooring, wall finishes, A/V equipment, technology and security equipment, casework, door and hardware, furniture, and other items. Pogue Construction is the selected General Contractor for this project.

Important Note: A virtual prebid will be held on January 14th followed by a site walk for each campus to be conducted on January 18th.

A Pre-Bid for these projects will be held January 14 @ 10AM
Join Zoom Meeting
https://pogueconstruction.zoom.us/j/8024773618

Meeting ID: 802 477 3618
One tap mobile
+13462487799,,8024773618# US (Houston)
+12532158782,,8024773618# US (Tacoma)

Pre-Bid Walk-Thru: January 18, 2021

1:00 PM – 3:00 PM – Homestead ES and Southridge ES, starting at Homestead ES

3:00 PM – 4:00 PM – Lakeview MS

READ MORE

Key School

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: HH

Appox. Budget: $2,500,000.00

Pogue Construction is the selected General Contractor for this project. This will be a new private school located in Fort Worth, Texas. This project consists of renovation of existing three story building, including selective demolition, new flooring and ceiling finishes, new MEP infrastructure including fire detection and suppression, Life Safety upgrades, A/V and Security upgrades.

Pre-Bid Conference: A pre-bid meeting will be held January 19, 2021 at 10AM at 7950 John T White Rd, Fort Worth TX 76120. Everyone is highly encouraged to attend.

READ MORE

Lakeview Middle School Electrical Upgrades

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

The Lakeview Middle School Electrical Upgrades project consists of a complete demo and replacement of the existing electrical switchgear in the building.  This is a CMAR project located in The Colony, TX, and Pogue Construction is the selected General Contractor.

A Pre-Bid for these projects will be held tomorrow, January 14 @ 10AM
Join Zoom Meeting
https://pogueconstruction.zoom.us/j/8024773618

Meeting ID: 802 477 3618
One tap mobile
+13462487799,,8024773618# US (Houston)
+12532158782,,8024773618# US (Tacoma)

Pre-Bid Walk-Thru: January 18, 2021

1:00 PM – 3:00 PM – Homestead ES and Southridge ES, starting at Homestead ES

3:00 PM – 4:00 PM – Lakeview MS

READ MORE

Aledo ISD Middle School

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: Huckabee & Associates, Inc.

Civil Engineer: Teague Nall & Perkins, Inc.

Landscape Architect: Teague Nall & Perkins, Inc.

Structural Engineer: Huckabee & Associates, Inc.

MEP Engineer: Baird, Hampton & Brown

Roofing Consultant: Armko Indutries

Technology Consultant: Wrightson Johnson Haddon Williams, Inc.

Estimated Start Date: January 1, 2021

Estimated End Date: June 29,2022

Narrative: Aledo Middle School #3 Consists of a new two-story Middle School approximately 181,000 SF with associated grading and site improvements. This project includes a new pre-cast ICC500 storm shelter area with special requirements and construction. This is a CSP project located in Fort Worth, TX.

READ MORE
1 12 13 14 15 16 26