Past Projects

Princeton ISD – Lovelady High School Addition

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for the Project.

Narrative: In general, the project consists of LOVELADY HIGH SCHOOL ADDITION 2022 which includes but is not limited to: dirt work, utility work, concrete paving, concrete walks, drilled piers, concrete slabs, structural steel, steel joists, metal deck, single ply roofing, steel studs and drywall, masonry, aluminum, steel and plastic laminate covered doors, aluminum windows, electrical, plumbing, and HVAC.

Interior finishes include but are not limited to: steel studs and drywall, resilient flooring, carpet tiles, ceramic tile, acoustical ceiling, millwork, casework, expansion joint covers, marker board, tack boards, projection screens, fire extinguishers and cabinets, toilet partitions, toilet accessories, metal lockers, identifying devices, and window blinds.

 

READ MORE

Community ISD – Turf Replacement

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for the Project.

Narrative: Furnish all labor, materials, tools and equipment necessary to install, in place, all synthetic turf material as indicated on the plans and as specified herein. The installation of all new materials shall be performed in strict accordance with the manufacturer’s written installation instructions, and in accordance with all approved shop drawings.

READ MORE

Prosper ISD – New Elementary School #18 – Package #1

****Bid Date Changed to February 7, 2023 via Addendum 2****

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for the Project. Package #1 Bid consists of a new elementary school including building exterior and interior finishes, storm shelter and new MEP/technology systems. Package #2 Bid, to be bid on a later date, will include site work trades.

 

READ MORE

BMW of McKinney

Bid Time: 3:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: This project consists of site and building construction for a new BMW facility and ancillary car wash and dumpster enclosure buildings.

READ MORE

Sanger ISD – Clear Creek Elementary School – Additions & Renovations

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pre-bid Meeting: Tuesday, January 10, 2023 @ 2:45. Location is Clear Creek Elementary School.

Narrative: Pogue Construction is the CMAR for the Sanger Independent School District for the Clear Creek Elementary School (currently Clear Creek Intermediate). Project consists of a 2,326 sf kitchen addition and a 22,898 sf classroom addition including a storm shelter. Portions of the existing building will be renovated for administrative purposes. A new fire sprinkler system for the existing building as well as a new fire alarm system. Work will consist of but not be limited to – interior demolition, concrete, masonry, ICF, structural steel, miscellaneous steel, millwork, waterproofing, sealants, air barriers, roofing, metal panels, doors, frames & hardware, tornado doors, overhead coiling doors, glass & glazing, drywall, acoustical ceilings, tile, VCT & carpet, resinous flooring, specialties, kitchen equipment, fire sprinkler including a fire pump and storage tank, plumbing, HVAC, electrical, voice & data, security, av, clock systems, fire alarm, earthwork, concrete paving, pavement markings, fences & gates, landscaping, and site utilities.

There is to be no contact with the owner or architect, all questions should be directed to Dennis Naylor at bid@pogueconstruction.com. A pre-bid will be scheduled and notification provided in a separate announcement. Bids are due January 17, 2023 at 2:00 PM and are to be sent to bid@poqueconstruction.com.

READ MORE

Brandon Tomes Subaru

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Project consists of ground-up, automobile dealership for Subaru franchise to be located in McKinney, Texas. Site work improvements include site work, retention pond, and landscaping. The main building is two-story in height and houses the main functions of the dealership. The building is 63,000 sq. ft. It is constructed of concrete tilt-up panels and structural steel framing. The second building houses the make-ready function, and there is also tilt-up construction.

READ MORE

Princeton ISD – James Elementary School

Bid Time: 2:00 PM

Deliver Bids To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for this Project. The Project includes a new elementary school and related site work.

READ MORE

Princeton ISD – Green Elementary School

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for this Project. The Project includes a new elementary school and related site work.

READ MORE

Montgomery ISD – New Elementary School #7 Early Bid Package #2

Bid Time: 2:00 PM

Deliver Bids To: bid@pogueconstruction.com

Narrative: Pogue Construction is the CM@R for the New Elementary School #7 to be constructed near the Lake Creek High School in Montgomery ISD. Pogue Construction is requesting bids on behalf of the Montgomery ISD for the purchase, shop drawings, submittals, and delivery of the Generators and ATS for the New Elementary School. The remaining packages for this project will be issued at a later date. Proposals from interested parties should be submitted to bid@pogueconstruction.com on or before December 14, 2022 @ 2:00 PM. Any and all questions should be directed to Dennis Naylor at bid@pogueconstruction.com or Blake Edwards at bedwards@pogueconstruction.com. There is to be no contact with the district or the design team at this time.

READ MORE