Past Projects

Princeton ISD Mayfield Elementary

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Estimate Start Date: January 26, 2021

Estimated End Date: April 1, 2022

Project Description:  Elementary School #6 (Mayfield ES) consists of a new two-story school building (79,116 SF) and associated site work  including playground areas, basketball courts and parking lots/drives.  This is a CMAR project located in Princeton, TX, and Pogue Construction is the selected general contractor.

PLEASE PAY CLOSE ATTENTION TO THE FORTHCOMING BID PACKAGES WHICH WILL INCLUDE VALUE MANAGEMENT ITEMS FOR YOUR SPECIFIC TRADE.  PRICING FOR THESE VALUE MANAGEMENT ITEMS SHOULD BE INCLUDED ON THE BID FORM YOU SUBMIT WITH YOUR PRICING.  THANK YOU!

READ MORE

Lewisville ISD Dale Jackson Renovations

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for this project, which consists of a 55,000 SF renovation to the existing Dale Jackson Career Center campus in Lewisville, TX. The renovation includes, but is not limited to: selective demolition, new paving and sidewalks, millwork, standing seam metal roofing, tiling, acoustical ceilings, resilient flooring, painting, new fire sprinkler system throughout the building, plumbing and mechanical renovations/upgrades, electrical including all new light fixtures throughout, voice and data, security and access controls, landscape and irrigation, site utilities and a new fueling system and wash bay. Tentative schedule is a mid-January 2021 start with a substantial completion of July 1, 2021.

There is a highly encouraged pre-bid meeting on Tuesday, November 10th at 8:30 AM that will occur at the Dale Jackson Career Center campus, located at 1597 S Edmonds Ln, Lewisville, TX 75067.

READ MORE

Eagle Mountain Saginaw ISD New Central Admin Building

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: VLK Architects

The work comprises the construction of New Central Administration Building for Eagle Mountain-Saginaw Independent School District, Fort Worth, Texas, as shown on the drawings and described in the specifications.

Pre-Proposal Conference: A pre-proposal conference is scheduled for 3:00 pm, local time, Thursday, November 5, 2020 with representatives of the Owner, Architect, and Engineer available to address proposal document issues with potential proposers. The pre-proposal conference will occur via Zoom at the address listed here:
https://vlkarchitects.zoom.us/j/93061611042?pwd=YkFwaUNSYmlqazYyem1qbm5SYVFIZz09

READ MORE

Katy ISD Raines High School Expansion

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Pre-Bid Conference: October 29, 2020 @ 2:00PM at Katy ISD Admin Building, Room 1030. 6301 S. Stadium Rd., Katy TX 77493

Architect: Stantec

The Project consists of a new 2-story stand-alone building for Raines HS and additional portables for Katy Independent School District, Katy, Texas, as shown on the Contract documents prepared by Stantec, dated October 19, 2020. Portables are phase 1 scope. The Work consists of Civil, Structural, Architectural, Landscaping, Mechanical, Electrical, Plumbing, and Technology requirements as indicated in the drawings and specifications.

READ MORE

Anchor Church

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

This project consists of the following: 44,619 sf Single Story Tilt wall construction, 800 +/- seat sanctuary, Children’s Ministry wing used as Licensed Pre-School Monday – Friday, Multi-use Auditorium / High School Ministry, Café, Church Offices / Administration Space, Sitework, Site Utilities, Hardscape, and Landscape, and 347 space concrete parking lot

READ MORE

Lewisville ISD Heritage ES Re-Roof & Flooring Replacement at 4 Campuses

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: Huckabee

Locations:

Lamar MS – 4900 Timber Creek Rd, Flower Mound, TX 75028

Rockbrook ES – 2751 Rockbrook Dr, Lewisville, TX 75067

Shadow Ridge MS – 2050 Aberdeen Dr, Flower Mound, TX 75028

Vickery ES – 3301 Wager Rd, Flower Mound, TX 75028

Heritage ES – 100 Barnett Blvd, Highland Village, TX 75077

Estimated Start Date: May, 2021

Estimated End Date: August,2021

The Flooring replacement project consists of resilient flooring demolition and replacement for Lamar MS, Shadow Ridge MS, Vickery ES and Heritage ES.

The Heritage re-roof project includes demolition and replacement of the existing roof including raising existing mechanical equipment and replacing gas piping.

 

Pre-Bid Information: December 3, 2020 @ 11:00AM

Join Zoom Meeting

https://pogueconstruction.zoom.us/j/8024773618

Meeting ID: 802 477 3618

One tap mobile

+13462487799,,8024773618# US (Houston)

+12532158782,,8024773618# US (Tacoma)

Dial by your location

+1 346 248 7799 US (Houston)

+1 253 215 8782 US (Tacoma)

+1 669 900 6833 US (San Jose)

+1 929 436 2866 US (New York)

+1 301 715 8592 US (Washington D.C)

+1 312 626 6799 US (Chicago)

877 853 5257 US Toll-free

888 475 4499 US Toll-free

833 548 0276 US Toll-free

833 548 0282 US Toll-free

Meeting ID: 802 477 3618

Find your local number: https://pogueconstruction.zoom.us/u/adfMOsjpNU

 

READ MORE

Cottonwood Creek Church Additional Parking Lot

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Pogue is the selected General Contractor for this project. This project consists of an addition of approximately 53,000 SF of concrete paving and entrances adding 201 additional parking spaces. Scopes of work required will include Concrete, Joint Sealants, Earthwork, SWPPP, Pavement Markings, Landscaping/Irrigation and Site Utilities.

READ MORE

Northwest ISD Middle School #7

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: Glenn Partners

NISD Middle School #7 is a new two-story building of approximately 161,000 SF consisting of classrooms, gymnasium, cafeteria, fine arts, and associated rooms. Site development shall consist of selective demolition, regrading, track & field events with associated paving and parking areas. This project includes a new ICC-500 storm shelter area with special requirements and construction. This is a CSP project located in Haslett, TX.

 

READ MORE

Goose Creek CISD Elementary School #17

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Pre-Bid: September 22, 2020 @2PM – https://leoadaly.webex.com/leoadaly/j.php?MTID=m06b697099972d59715db746a4b87a19c Meeting Number: 133 327 8258 Password: GCCISD

RFI’s Due: September 23, 2020

We understand that the proposed project consists of a new single‐story elementary school approximately 99,590 square feet in size. The new building will be a steel‐framed structure. New driveways and parking areas are also planned.  The new elementary school site is located at the southwest corner of the intersection of Garth Road and Ashbel Crossing Drive in Baytown, Texas.

READ MORE

Aledo ISD Elementary School #6

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: PBK

Pre-Bid: September 15, 2020 @ Aledo ISD Admin Building @ 10:00AM

The Work of Project is defined by the Contract Documents and consists of the following: All news +101,000 sq. ft., two-story, K-5, 800-Student Elementary School, Steel Framed, with ICF Framed ICC 500 Storm Shelter Gymnasium. Work includes Site Work, Utilities, Paving, Playgrounds, Landscaping, Irrigation, Concrete Foundation, Steel Framing, Low-Sloped Roofing, Exterior Masonry Finishes, and Glazing.

READ MORE