Past Projects

One Community Church

One Community Church has teamed with Pogue Construction to build a satellite campus in Prosper, TX. Construction consists of a 37,000 concrete tilt-panel building with associated site work. This is a CM@R project, and Pogue is the selected general contractor.

Project budget: $10,000,000

Expected Construction Start: October 1, 2018

READ MORE

Aubrey ISD Brockett and Monaco Elementary School Renovations

Brockett ES: The Aubrey ISD Brocket Elementary School Additions and Renovations project consists of renovations to existing classrooms and vestibules, and the addition of a new 6,000 SF wing containing an art room and four classrooms. The mechanical system for Brockett ES is an RTU/Heat Pump system.

Monaco ES: The Aubrey ISD Monaco Elementary School Additions and Renovations project consists of the addition of two new wings, one for fifth grade and one for third grade. The wings are 2,700 SF and 1,600 SF, respectively. Minor renovations will also occur within the building. The mechanical system for Monaco ES is geothermal, and will require additional geothermal bores and piping to each of the classroom additions.

 

Specifications are shared between the Brockett ES Project and the Monaco ES Project. Please provide a separate proposal for each school.

 

A Pre-Bid Meeting will be held at 9:00 AM on Friday, July 27, 2018, for both Brockett ES and Monaco ES. The meeting will be held at Brockett ES – 900 Chestnut Street, Aubrey, TX 76227. Attendance is highly encouraged for all bidders.

Location

  • Brockett ES – 900 Chestnut Street, Aubrey, TX 76227
  • Monaco ES – 9350 Cape Cod Blvd, Providence Village, TX 76227

Estimated Start Date: September 3, 2018

Estimated End Date: July 3, 2019

READ MORE

Aubrey ISD High School Controlled Entry Vestibule

The Aubrey High School Controlled Entry Vestibule project for Aubrey ISD is a renovation of the existing entry vestibule into a controlled entry point for the high school. The existing layout will be removed to allow for the new entry vestibule to be constructed along with a new space for the reception and a PEIMS room. Trades involved with the renovation include doors, windows, flooring, drywall, masonry, electrical, mechanical, access control, security, millwork, demolition, steel, and concrete.

Pre Bid Walk: 7/20/2018 at 1:00PM

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: Huckabee

Location: 510 Spring Hill Rd., Aubrey TX 76227

Estimated Start Date: Mid August 2018

Estimated End Date: November 2018

READ MORE

Mansfield Charlene McKinzey Middle School

Charlene McKinzey Middle School is a new 2-story; 213,607 square foot facility with associated site work for the Mansfield Independent School District in Mansfield, TX. Minimal off-site work. All spoils are to be stock piled on-site.

Bid Time: 2:00Pm

Bids Delivered to: bid@pogueconstruction,com

Pre-Proposal: Wednesday, August 22, 2018 at 2:00PM at Newsom Stadium Community Room located at 3700 E Broad St, Mansfield, TX 76063

READ MORE

UNT Indoor Practice Facility

This project will be a milti-use facility designed primarily for football with an ancillary use for track & field, soccer, and other uses. The facility will be an efficient retangular shape, approximately 196′ wide X 426′ long with a minimum clearance height of 55′ for place kicking. The Indoor Practice Facility wll be a pre-engineered barrel beam steel structure that houses a full artificial turf practice field with eighteen (18) runoff space on all sides. Within this runoff space are three (3) sprint lanes and a sand pit on the Eastern side of practice field. Ancillary spaces include entry lobby and restroom, recruiting lounge, kitchenette, restrooms, A/V, telecom, electrical rooms, stairs, and camera platforms, fire protection/sprinkler system, and tempered by full HVAC systems. The facility will be located south of the Athletic Center, constructed over one of the existing grass practice fields.

Bid Day: July 25, 2018
Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com

Pre-Proposal Meeting Date: July 9, 2018
Pre-Proposal Time: 3:00PM
Pre-Proposal Site: Apogee Stadium, HUB Club, 1251 S. Bonnie Brae, Denton, TX 76207

READ MORE

TCCD Tarleton

Narrative: TCCD – Tarleton consists of an approximately 30,000 SF interior demolition and finish out of the 5th floor of an existing building. This is a CM@R project located in Fort Worth, TX, and Pogue is the selected general contractor. Bid forms will be released approximately one week prior to bid day. This is an active campus, and all loud work must be completed outside of normal work hours. Review the project schedule and bid packs to determine what is considered loud work.

Bids Due: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Project Location: 300 Trinity Campus Circle-Building C “Westfork” 5th Floor; Fort Worth, Texas

Estimated Start Date: July 31, 2018

Estimated End Date: January 29, 2019

 

READ MORE

UNT Fouts Field Demolition, Parking, and Bus Transfer Station

This project will demolish the remaining portions of the existing Fouts Field structure and field to include disconnect of utilities, running new utilities to new bus transfer station. Once demolished, fill in void where field was and prepare surface parking of approximately eleven hundred (1,100) additional parking spaces in Lot 20. The project also includes the construction of a new bus transfer station of approximately three thousand (3,000) square feet in Lot 20. The structure will include restrooms and vending machines.

RFI Submittal Due Date: June 27, 2018 by 2:00PM

Pre-Proposal Meeting: June 12, 2018 at 2:30PM at BSC, Woodhill Square, Conference Room 4202A, 1112 Dallas Drive, Suite 4200, Denton, TX 76205

Architect: Huitt-Zollars

Bid Date: July 10, 2018

Bids Delivered to: bid@pogueconstruction.com

If your company is HUB certified, please make sure to submit all certifications with your bid.

 

READ MORE

Midlothian Middle School #3

Midlothian Middle School #3 is a new 175,000 square foot facility with associated site work for the Midlothian Independent School District located in Midlothian, TX.

Project budget: $51,000,000

Bid date: October 3, 2018 @ 2:00pm

Bids delivered to: bid@pogueconstruction.com

Project Location: Intersection of Sudith Ln and Sunbeam Ct; Midlothian, TX 76065

Estimated Start Date: December 1, 2018

Estimated End Date: July 1, 2020

A Pre-Bid Conference will be held at 9:00AM on Tuesday, September 25th at Midlothian ISD Administration Building – 100 Walter Stephenson Rd, Midlothian, TX 76065. Attendance is highly encouraged for all trades.

READ MORE

Wylie Tibbals Elementary School Additions

The Harry & Retha Tibbals Elementary School Addition is an 8,000 SF addition to the existing building. The addition will add six (6) new classrooms, two (2) staff restrooms, a janitor closet, IDF room, and an electrical room to serve the school. To make room for the new space, the existing paving and utilities will need to be removed. The existing reception area will also get a new reception desk. This project has two alternates. The first is to replace the specified Carrier HVAC equipment with Trane equipment, with the second alternate switching to AAON equipment in lieu of Carrier. The project will run from August 1st to December 1st of 2018. This schedule is subject to change.

Location: 621 Waters Edge Way, Murphy, TX 75094

RFI Due Date: June 8th, 2018 at 4:00PM

Pre-Proposal Meeting: June 7th, 2018 at 10:00AM

Estimated Start and End Date: August 2018 – December 2018

Architect: PBK

 

READ MORE